top of page

| OUR PROJECTS

Photo 10-28-19, 8 20 18 AM.jpg

Client:BEG Italian

2019

Project :Turbopumps station

Al-Faw Depot

Location: Basra Al-Faw

DSC_0058-5.jpg

Client: Investment with Nakhil Alkhasib Co.

2019

Project:  Al-Khor Port BERTH 11A

Location: Basra AL-Khor

Photo 10-30-19, 9 14 41 AM.jpg

Client: Petrofac

2019

Project: Construction of early civil works and steel pilling installation works

Location: Basra Majnoon Oil field

Photo 10-30-19, 9 27 16 AM.jpg

Client: ElSewedy Electric Power

2019

Project: Iraq 4 × 400 KV Substations Shatra Substation

Location : Basra Shatra Substation

QTY: 43,370 m

LATEST PROJECTS

KKKK.PNG

OUR PROJECT WITH SELL CO.

Capture.PNG

OUR PROJECT WITH KBR

5.png

PROJECT WITH Matt MacDonald

images (1).png

OUR PROJECT WITH BOC

taaz-group.gif

OUR PROJECT WITH TAAZ

SHOW ALL
clients_logo15.jpg

OUR PROJECT CALETHON CO.

SHOW ALL
CS073_CHIYODA_b.png

OUR PROJECT CHIYODA CO.

Picture4.png

OUR PROJECT WITH DAEWOO E&C

mm.PNG

OUR PROJECT WITH PetroChina CO.

vap_4866380225.jpg

OUR PROJECT WITH Schlumberger 

Samsung-Logo.jpg

OUR PROJECT WITH SAMSUNG ENG

mitas.png

OUR PROJECT WITH MITAS

0 (1).png

OUR PROJECT WITH UNAOIL

download (1).png

OUR PROJECT WITH Perkons CO.

uaQxTtbA_400x400.png

OUR PROJECT WITH PAE

LL.PNG

OUR PROJECT Pertofac CO.

ds.PNG

OUR PROJECT WITH BGC

77.PNG

PROJECT WITH 77 construction 

bmas (2).png

OUR PROJECT WITH Basra Mass

kitayskaya-zhongman-petroleum-and-natura

OUR PROJECT WITH ZPEC 

unnamed.jpg

OUR PROJECT WITH ENKA

pw0_6kGq_400x400.png

OUR PROJECT CCC CO.

4.png

OUR PROJECT WITH HAILIBURTON 

KL.PNG

OUR PROJECT WITH ARKEL CO.

bottom of page